MVE Františkov nad Ploučnicí

Our power plants
Small hydropower plant
This power plant has a horizontal Francis turbine with an output of 0.576 MW. The power plant was also renovated in 2018. The hydraulics for turning the turbines were inspected, and the weir sill and the weir and sluice gates were successfully repaired. Social facilities for the power plant's operators were also built. A new overflow structure was added to the inlet into the plant. The power plant was connected to the monitoring centre in Brno, which means production is constantly under supervision.
Small hydroelectric power plants in Czechia and Slovakia have already reached their maximum possible yield under our operation, and there is no room for growth in this area.
Therefore, it was the right time to sell them, which we successfully did at the end of 2025.
Capital recycling
Česká republika
MVE Františkov nad Ploučnicí
MVE Františkov nad Ploučnicí
Installed power
0,576 MW
Installed power
Annual production
754 MWh
Annual production
Year of launch
2002
Year of launch

Invest in Geen

Energy bonds are a great way of appreciating your invested funds.
Invest in Geen
Dekorace